Back

The firm will carry out front-end engineering and design (FEED) study on two  bioenergy with CCS units at the plant, capturing around eight million tonnes of CO2 per year.

Commercial details of the FEED study have not been disclosed but Drax said that it, along with other work such as site preparation and decommissioning represent a £40million investment from Drax in the facility during 2022.

Read the full story here.

Photo Credit: Energy Voice.

Share this event

Back

Become a Member

Decom Mission membership gives you and your team access to networking, events, and knowledge to help you build connections and grow your business in the decommissioning sector. Join our global membership and boost your business.

Membership Enquiry About Us
Keep Signed In

Update Password?